02. June 2020

Return visit to Rosenhaga pre-school - ten years later

Cembrit Patina Original

The preschool was built in 2008. Photo taken again in 2018.

 

Place-painted Cembrit Construction (then called as MINERIT Facade board).

Below is a construction picture in 2008 which shows what it looked like before the painting.